Potential Construction Projects

Road from Belo Ozero to Tenagra

  1. Road, leveled earth (8’ wide, 96 miles long) – 14,400 GP – 29 days – Secure 20 sq. mi or attract 79 families
  2. Road, leveled earth (10’ wide, 96 miles long) – 18,000 GP – 36 days – Secure 26 sq. mi or attract 99 families
  3. Road, gravel (8’ wide, 96 miles long) – 28,800 GP – 58 days – Secure 41 sq. mi or attract 158 families
  4. Road, gravel (10’ wide, 96 miles long) – 36,000 GP – 72 days – Secure 51 sq. mi or attract 198 families
  5. Road, paved (8’ wide, 96 miles long) – 57,600 GP – 115 days – Secure 82 sq. mi or attract 317 families
  6. Road, paved (10’ wide, 96 miles long) – 72,000 GP – 144 days – Secure 102 sq. mi or attract 396 families

Note:
-Any functional road will half the travel time from Tenagra to Belo Ozero, from 9 days to 4 days for Heavy Infantry. Wagon travel time would be reduced from 16 days to 5 days.
-Unpaved roads are impassable during Rasputitsa (April, October).
-10’ roads are required for two-way wagon traffic.
-Using multiple construction teams will speed construction, up to 96 times if the manpower can be found.

Canal from Belo Ozero to Tenagra

Polling Canal (3’ deep, 16’ wide, 96 miles long) – 973,210 GP (half digging and half filling) + Lock Cost – 20 days with 96 teams or 13 castings plus 10 days of filling with 96 crews – Secure 43 6 mile hexes or attract 5,352 families.

Note:
-A polling canal would reduce travel time from 4 days with a road to 3.25 days.
-Securing 96 work teams is a significant logistical challenge.

Rowing Canal (3’ deep, 32’ wide, 96 miles long) – 1,946,419 GP + lock cost – 40 days with 96 teams or 20 days plus 26 castings of move earth – Secure 86 6 mi hexes or attract 10,705 families.

Note:
-A polling canal would reduce travel time from 4 days with a road to 1.6 days.
-Securing 96 work teams is a significant logistical challenge.

Potential Construction Projects

The Novgorod Campaign greatonenate15 greatonenate15